Flow from Consulting to Quantity Production
We have three patterns of flow from consulting to quantity production.
Pattern A | Pattern B | Pattern C | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
In this case the specification has been decided and its possible to produce with the existing equipment. | In this case specification has been decided but it is impossible to produce with the existing equipment. | In this case the specification is still under discussion | ||||||||
|
|
|
||||||||
|
|
|
||||||||
|
|
|||||||||
|
||||||||||
|
||||||||||
|